Datalogic DX8200A-3010 Manuale di Installazione Pagina 25

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 24
INTRODUCTION
9
1
Figure 1 - PCT-8000 First Run
After elaborating the passage of the parcel, the Master scanner again shows the
status of each node (of each scanner of the cluster) and then the Continue or Stop
screen.
6. Repeat steps 3 - 5 changing the PCT-8000 X position (i.e. always before the PS Line
(reference point) and parallel to a conveyor edge but changing to the left-hand edge
and/or to the center of the conveyor), until the procedure terminates.
Figure 2 - PCT-8000 Second and Third Runs
Typically 3 passes are necessary.
Vedere la pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 138 139

Commenti su questo manuale

Nessun commento